ScoredApps
Cal AI - Calorie Tracker icon

Cal AI - Calorie Tracker

6.6/10
Our score
★ 4.5 Google Play·1M+ installs
Reviewed by Editorial Team, ScoredApps editorial · updated 2026-10-06

Screenshots

Cal AI home tab with a 1250 calories-left ring, protein, carbs and fats rings, and a list of recently uploaded mealsCamera scanner pointed at a stack of blueberry pancakes, with a Scan food mode bar along the bottomNutrition result for pancakes with blueberries and syrup showing 615 calories, macros, a 7/10 health score and a Fix Results buttonAnalytics tab with a weight progress chart, 90 Days to All time tabs and weekly stacked bars for carbs, protein and fats

About Cal AI - Calorie Tracker

Cal AI has no ongoing free tier: food-scan results need a subscription, and a 3-day trial is the way in. Behind the paywall sits a calorie and macro tracker built around a photo, with barcode, typed and voice logging and a Fix Results step to correct the AI's guess. The developer's own help page puts accuracy at about 80 percent, and 2026 Google Play reviews report lost streaks and wiped histories.

App information

DeveloperViral Development LLC
Version26.45.1 (Android) · 26.46.1 (iOS)
Size115 MB (Android) · 336 MB (iOS)
Price / In-appFree
Contains adsNo
In-app purchasesYes
Content rating9+
Requires (Android)Android 10+
Requires (iOS)iOS 18.0+
Interface languagesAR, AZ, NL, EN, FR, DE + 9 more
Store rating (Google Play)4.5 from 272,491 ratings
Installs1M+
Updated by developer2026-11-19
Data checked2026-11-20

Specs come from the official store listings and were last checked on 2026-11-20. Developers change pricing and requirements — check the store page before installing.

Cal AI Review: Fast Photo Logging Behind a Hard Paywall

The 3-day trial and what the Free label really covers

The store listing says it plainly: food-scanning results require a subscription, so Free describes the download, not the product. An onboarding questionnaire comes first, and Play reviewers say the price appears only after it, with the trial asking for payment details up front. The developer's help page treats the + button as the paywall trigger: tapping it opens the purchase screen until a subscription is restored. Store listings show in-app purchases from $9.99 to $59.99 on Google Play and from $0.99 to $29.99 on the App Store. These are regional and can change, so read the paywall before paying. Cancelling happens in Google Play or iPhone Settings, not in the app, and deleting the app does not stop billing.

Snap, scan, speak or type: Fix Results in practice

Logging starts at a camera screen with a Scan food mode. The result card lists each detected item with its own calories, such as blueberries 8, syrup 12 and pancakes 595 in the store screenshot, then totals calories, carbs, protein and fat and adds a health score out of 10. Fix Results sits next to Done, so a wrong guess can be edited before the entry is saved. The same flow takes barcodes and typed descriptions, and the privacy notice mentions voice logging. The developer says the phone's depth sensor estimates food volume, yet its support page concedes about 80 percent accuracy. Reviewers agree that portions and mixed home-cooked dishes are the weak spot, and one reported the same meal landing 400 calories apart on different days.

Streak Restore, lost histories and a health-data trail

The App Store lists a Streak Restore purchase at $0.99, which fits a pattern in Play reviews from August to October 2026: streaks resetting despite daily logs, and reinstalls that came back empty even with the same sign-in, although the help page says data lives in the cloud. The privacy picture is heavier than a food diary suggests. The notice lists date of birth, gender, height, weight, BMI and progress photos, and Apple's label marks device ID and advertising data as used for tracking. Google's Data safety card says data is encrypted in transit and can be deleted on request. Notifications draw complaints too: a Family Plan upsell kept appearing for a reviewer who had already paid for a year.

Pros

  • Photo, barcode, typed and voice logging all feed one daily calorie ring
  • Fix Results lets you edit detected items before an entry is saved
  • Result card shows per-item calories, macros and a health score out of 10
  • Analytics tab charts weight from 90 days to all time, plus weekly macros
  • Apple Health connects from the calories screen and brings steps into the calorie view
  • Developer's help page publishes its own accuracy estimate of about 80 percent

Cons

  • No ongoing free tier: scan results need a subscription, and the price appears after onboarding
  • Play reviews from 2026 repeat lost streaks and empty histories after reinstalling
  • Subscriptions cannot move between iPhone and Android, and cancelling is possible only in store settings
  • No import of MyFitnessPal history, and mixed dishes or portion sizes often need manual correction

We don't host any files. These buttons open the official Google Play and App Store listings.

Verdict

A 6.6 reflects a quick photo logger held back by a hard paywall, an admitted 80 percent accuracy and repeated reports of lost streaks and histories. Take it if speed of logging matters more than precision and you are happy to pay after a 3-day trial. Skip it if you want a real free tier, need exact macros or micronutrients, or find calorie counting stressful. It offers suggestions, not medical advice.

Core function7.5Photo, barcode, typed and voice logging with Fix Results; the developer itself puts scan accuracy near 80 percent.
Ease of use7.5Camera-to-result flow is short, but a long onboarding questionnaire comes before the price or the first scan.
Monetisation5.0No free tier, trial needs payment details, store prices span $9.99 to $59.99, and plans cannot cross platforms.
Performance5.5Reviewers report lost streaks, slow food search and histories wiped after a reinstall, despite cloud storage promised in the help page.
Privacy & permissions6.5It stores height, weight and progress photos; Apple's label flags device ID tracking, while Play confirms encryption in transit and deletion requests.
6.6out of 10 · weighted average of the five scores above

Readers’ rating

Not enough reader ratings yet. Be one of the first.

Used Cal AI - Calorie Tracker? Rate it

One rating per visitor, no sign-up. The average updates once a day. Store ratings are shown separately and are not mixed in.

Frequently asked questions

1

Is Cal AI free?

No. The download is free, but food-scan results need a subscription, and the app asks onboarding questions before the paywall appears. A 3-day free trial is advertised on the developer's site. Cancel it in Google Play or iPhone Settings before it ends, because deleting the app does not stop billing. Prices vary by region and plan, so confirm the amount on the paywall.

2

How accurate is Cal AI's photo scanning?

The developer's help page says about 80 percent, and it advises good lighting with the food in focus and filling the frame. Reviewers find single items fine but mixed home-cooked dishes and portion sizes weaker, and some report one meal logged with different calories on different days. Use Fix Results to correct items before saving the entry.

3

How much does Cal AI cost?

The developer's website lists no prices; the plan and amount appear on the in-app paywall. Store listings give ranges: in-app purchases run $9.99 to $59.99 on Google Play and $0.99 to $29.99 on the App Store, and a Family Plan exists. Treat these as regional and changeable, and check the paywall in your own country before paying.

4

How do I cancel Cal AI and what happens to my data?

Cancel in Google Play under Payments and subscriptions, or in iPhone Settings under Subscriptions; the app has no cancel button, and uninstalling does not cancel. Refunds go through Google or Apple. A subscription cannot move between iPhone and Android. Your log sits in the cloud under your Apple or Google sign-in, and Google's Data safety card says you can request deletion.

5

What are good alternatives to Cal AI?

MyFitnessPal logs by database search, photo scan or voice and keeps a free tier with ads, with barcode scanning in Premium. Cronometer's free plan tracks up to 95 nutrients without an ongoing paywall, though photo logging belongs to Gold. Cal AI cannot import MyFitnessPal history, according to its help page, so switching means starting a fresh log.

Similar apps in Health & Fitness

All in Health & Fitness →

About this page. ScoredApps reviewed Cal AI - Calorie Tracker independently. We don't own, develop, or distribute this app, and we're not affiliated with Viral Development LLC. Official site: www.calai.app/ · Google Play listing · Developer support: support@calai.app